Home
Project Stages Getting Started Hull Construction > Building the Form > Planking > Fiberglass > Fitting the Frames > Lower Deck > Ballast Test > Main Deck & Finishing Masting and Rigging Into the Water
Credits About the project
Marking the depth of a side wall of the foot well. The top edge is straight but the bottom edge needs to rest on the frames. The side walls will be laminated from two thicknesses of ¼” plywood. This is done to allow the wall to curve.