Home
Project Stages Getting Started Hull Construction > Building the Form > Planking > Fiberglass > Fitting the Frames > Lower Deck > Ballast Test > Main Deck & Finishing Masting and Rigging Into the Water
Credits About the project
An 8’ section of the right side of the lower deck has been shaped to fit the hull which required notching for the frames. It is in position to be marked for cutting so that it is flush with the side walls.