Home
Project Stages Getting Started Hull Construction > Building the Form > Planking > Fiberglass > Fitting the Frames > Lower Deck > Ballast Test > Main Deck & Finishing Masting and Rigging Into the Water
Credits About the project
4 panels of 50” wide 6oz fiberglass cloth are draped over the hull. One at a time, each of these panels will be bonded to the hull with the second coat of epoxy.