Home
Project Stages Getting Started Hull Construction > Building the Form > Planking > Fiberglass > Fitting the Frames > Lower Deck > Ballast Test > Main Deck & Finishing Masting and Rigging Into the Water
Credits About the project
This is a closeup of the sternpost showing the core of 1”thick plywood with sides of ¾” pine. The pine, which is a lot softer than plywood, will be shaped to provide a solid landing for the planking. The stem is made the same way.