|
 |
Selected past projects
Please note that AQSim regularly works under the restriction of a non-disclosure agreement (NDA) for almost every simulation study that we undertake. This significantly limits our ability to discuss the details of our past work.
|
|
|
Mineral Scale Projects
(by field)
Albian
Astraea (Angola)
Atlantis (GOM)
Bonga
Buick (USA)
Campos BC-10
Campos BMC-8 (Brazil)
Claire (North Sea)
Corrib (including MeOH recovery)
Crosby
Davis Thunder Horse (GOM)
Folks (Rockies)
Gendalo (South China Sea)
Glider
Gorgon (Indian Ocean)
Green Bice
Habanera
Janz/IO (Indian Ocean)
Juno (Angola)
Kern River (CA)
Knotty Head (GOM)
Liberty (Alaska)
Llano
Mica (GOM)
Mobil Bay (GOM)
NaKika (GOM)
Penguin
QatarGas 3&4 (Arabian Gulf)
RasGas (Arabian Gulf)
Sakhland 1&2 (Berent Sea)
Schrader Bluff (CA)
Seria North Flank
Shearwater
Skarv (North Sea)
South Pars (Iran)
South Timballier (GOM)
Steamboat (Rockies)
Tombua-Nandana (Angola)
Utsira (North Sea)
Vermillion
Zakum (Arabian Gulf) |

Alberta Projects
Process water evap/crystalliz'n
(zero liquid discharge)
Upgrader foul gas scrubbing
Upgrader sour water stripping
SynGas shift/recovery
Mechanical vapor recompression NH3 stripping and purification
SagD evaporator feed boilup
MEG/MeOH recovery/produced water
|
General Projects
Sour water stripping
Flue gas recovery
(NH4)2SO4 evaporator recovery
CaF2 recovery
Berillium recovery
NaHCO3 Purification
Sulfate stripper
HF/SO3 distillation
Ca(OH)2/Mg(OH)2 purification
Coke Oven Gas purification
Pyrovskite to TiO2 design
Refinery amine unit
Evaporator-Crystallizer: optimization
Kraft process:
chemical recovery
Jetwater:
Water purification design
Microchip fabrication:
Water recovery system
Flakt Modo process:
Flue gas oxidation |
|
Environmental Projects
Tailings Pond water chemical fate
Armanda Lake remediation
Mildred Lake water chemistry forecast
Landfill Leachate fate and transport |